During the process, continous feedback and material was provided by the client, leading to new discoveries for us. Not noticable on the high resolution photos, but through schematics, it was required to adjust the boiler room with 5 instead of 4 boilers at the breach.
You need to be a member of NewsPageDesigner to add comments!
Join NewsPageDesigner